two row Corn Combine Harvester for hot sale 4YZP-2
No.1 ----- Efficient -----
1. Weichai brand 14hp diesel engine, save fuel but
strong power.
2. High working speed, 6-7km/h. The working
efficiency reaches to 0.8 hectare/h.
3. Short body of 7 meters, the turning radium is
reduced. Enlarged dumping box can reduce the discharge times
Small three row corn combine harvester for hot sale
NO.2 ------- Realiable -------
1. Extended divider performs good in harvesting lodged
plant
2. Radiator cover adopts wavy structure to reduce the
touch area between stalk and cover, so that the cooling is more efficient.
3. This series of Corn Harvester gained more than 20
patent technology.
Small three row corn combine harvester for
hot sale
NO. 3 ------ Durable --------
1. The whole machine adopts SPC belt, the use lifespan is
3 times longer than commen belt.
2. E-coating parts can avoid large area
rusting within three years
3. The chasis adopts Q345 Mn steel, the lifespan
can reach to 10 years
4. The peeling roller adopts rubber of
tire material, good performance and durable.
Two Rows Corn Combine Harvester Two Rows Corn Combine Harvester,Self Propelled Corn Picker,Corn Picker Machine,Self-Propelled Harvester Shandong Gold Dafeng Machinery Co., Ltd , http://www.golddafengharvester.com
The construction period of this large-scale wind energy base is relatively long. The first batch of wind power generation equipment will wait until the second half of 2015. It will take at least a year and a half for the successful construction of this large-scale wind energy base to determine successful bidders. In 2004, France had failed to bid for the offshore wind power generation base.
France builds a large-scale offshore wind power base worth 15 billion euros
On August 24th, France reportedly will invite the construction of a 3,000 MW offshore wind power generation base in September. The wind power generation base will be built in the Loire Valley, north of Brittany, Languedoc-Roussillon and the Normandy coast, encircling Senna. River bays and the Soma Bay to avoid damaging scenery and shipping. 3000 megawatts of generating capacity is equivalent to the power of two EPR nuclear power plants. The French Ministry of Energy and Environmental Protection describes this investment as approximately 15 billion to 20 billion euros.