Gold Gravity Concentration Equipment
The STL water-jacketed Gold Concentrator is a kind of gravity separation equipment. It was developed by Changchun Gold Research Institute Co., Ltd. in 1985 and entered the market. At present, it has been used in many domestic and foreign companies. It is suitable for the recovery of single gold in placer gold, vein gold mines and polymetallic mines, instead of mercury plate operations. The addition of large single gold particles in the collected ore before flotation can further increase the recovery rate of gold mines, and it can also be used from gold-bearing mines. Separate single gold from flotation gold-copper concentrate and flotation gold concentrate.
The main indicators of this series of equipment basically reach the level of similar international products (such as Nielsen gold selectors, etc.). Compared with similar equipment at home and abroad, this series of equipment has the advantages of high cost performance, easy operation, and low maintenance costs.
Gold Gravity Concentration Equipment,Gold Separating Concentrator,Gold Recovery Centrifugal Concentrator,Centrifugal Gold Concentrator Changchun Gold Research Institute Co.LTD , https://www.changchunmachine.com
According to the national industrial policy, since July 1, 2008, China's automobile industry has been forced to implement the country III emission standard, and the national II emission standard of the automobile is not allowed to produce and sell. Since only a small number of products of the State III are currently in the experimental stage, resulting in the Nanjing XCMG automobile. The company is in an unfavorable situation.
In order to enable the company to resume production as soon as possible, management work can be performed normally. The leading group of Nanjing Xugong Automobile Company went deep into the front line and function department of the workshop to understand and analyze the production and management situation. After careful research and planning, and inverting the time limit, it proposed the “National III Product Production Technical Preparation†and “National III Product Production and Testing Three project implementation plans for “Preparation for Batch Production†were implemented with project management to ensure the successful trial production of China III products and the full recovery of production in September and October. The determination of the “three projects†is an important link and measure for Nanjing Xugong Automobile Co. to restore production order and change the existing status. The company’s leadership team requires all departments to fully cooperate with the implementation and implementation of the “three projects,†and the project team should actively coordinate Communicate all aspects of the work and strictly follow the project plan to fully prepare for the full recovery of production.
The company focused on changing the difficult situation as soon as possible, accelerating the development of a bigger and stronger heavy truck industry, achieving the goal of entering the first group army in the heavy truck industry, and further accelerating internal and external adjustments and the implementation of advanced management tools.
View related topics: State III standard commercial vehicle companies usher in new challenges