Fuel Dispenser (JDK50S)

Model NO.: JDK50S
HS Code: 84131100
Starlight Series
JDK50C111S(1HOSE 1Pump)
External Dimension:990x460x2150(mm)
Technical Specificatons

Components Installed(standard)

LanFeng Electronic Unit 

MJ-65 Flowmeter

ZYB-50 Vane Pump

TD-20A SelfShut-Off Nozzle

380V Ex-Motor

 

Technical Specifications

Accuracy: ±0.3%

Frequency: 50HZ±1HZ

Delivery Rate: 5 to 50L/min

Rating Power: 0.75KW

Measurbale Minimum: 5L

Ambient Humidity: 30% to 90%

Noise: ≤80dB(A)

Ambient Temperature: -40C to +60C

Inlet Vacuum: ≥0.06MPa

Anti-Explosive ID: Exdm[ib]ib II AT3

Register Range: 0.00 to 9800.00L or Yuan

Anti-Explosive Certificate Number: CE011154 CE011155 CE011156 CE011157

Totalizer Range: 0.00 to 99999999999.99L or Yuan

Range of Price: 0.01 to 99.99Yuan/L

License of Manufacturing Metric Instrument: ZheZi00000625

Preset Min Value: 0.00 to 0.99L 

Power Supply: AC380V±20% or AC220V±20%

 

Pre-insulated Pipe Fabrication

Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.

All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling


Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine

WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.pipefusionwelding.com